Construction

Vinyl Liner Pools

Polymer Panel

  1. Panel Assembly
    Panel Assembly
    All panels are made of highly durable, non-corrosive polymer panels. Using the Graphex line of interlocking wall members, these panels will hold up year after year.
  2. Plumb Out
    Plumb Out
    The plumbing all goes under the pool deck (concrete), we plumb out the pool before the final back fill to avoid settling issues.
  3. Backfill
    Backfill
    Using the Graphex polymer crossmember braces as our reference guide and structural support, back fill is quick and easy. Pools remain level and secure throughout this process.

Fiberglass Pools

  1. Drop In
    Drop In
    Once the hole is prepared, the pool is lowered into place via mechanical advantage then leveled.
  2. Plumb Out
    Plumb Out
    A network of plumbing and electrical conduits are ran through trenches which pass from the pool to the pump station. The equipment pad can be located almost anywhere you want.
  3. Backfill
    Backfill
    Fiberglass pools require water and back filling to take place simultaneously. We choose clean gravel for our back fill instead of sand, which can settle with time.